Trade cover · Newcastle & the Hunter
Insurance for scaffolders
Scaffolding is one of the few trades where a single incident can be catastrophic. A collapse or a falling component on a public footpath is a serious injury claim, and because your equipment stays on other people's sites for weeks at a time, you also carry a property exposure that very few trades policies are built for.
The policy
What scaffolders actually carry
Not a package off a shelf. Each section below does a specific job, and the ones marked baseline are what a scaffolder needs before the first site visit.
- Public & products liabilityBaseline
- Injury and property damage from collapse, falling components, striking a structure during erection, and the public exposure of footpath and street scaffold. $20m is the practical minimum.
- Scaffold stock & plantBaseline
- Your scaffold inventory against theft and damage — including while erected on a site you do not control, which is where most of it is at any given time.
- Personal accident & sicknessBaseline
- Workers compensation in NSW covers your employees, not you. If you are a sole trader or working director, an injury that stops you working stops your income — personal accident and sickness cover is what replaces it.
- Commercial motor & trucksBaseline
- Trucks, crane trucks and trailers, plus the load restraint exposure of carting components.
Depending on the work you take on
- Goods in transit
- Scaffold components in transit between yard and site are not covered by a motor policy.
- Professional indemnity
- Relevant where you design the scaffold or provide an engineered solution rather than erecting to a supplied design.
Read this part
Where scaffolders get caught out
Two certificates can show the same limit and behave completely differently at claim time. These are the clauses that decide it for your trade.
01
Scaffold stock sitting on sites you do not control
At any time most of your inventory is erected on sites controlled by someone else, and theft of scaffold components from active sites across the Hunter is persistent. Standard tools sections are not written for this: they assume equipment comes home at night. Scaffold on hire needs its own section, with a limit that reflects the value of stock out at peak.
02
Liability after you leave site
The scaffold stays up for weeks while other trades use it, modify it and overload it. If it fails, you will be joined to the claim regardless of who moved the handrail. Handover documentation, scafftags and inspection records are the practical defence, and they are only useful if they are kept systematically.
03
Public exposure and the limit of indemnity
Footpath, street and shopfront scaffold puts the public directly under your work. A serious injury claim with ongoing care costs can exceed $10m, which is why principals and councils specify $20m — and why going cheap on the limit is a false economy in this trade specifically.
Licensing
Keep the licence current
Scaffolding work above the prescribed height in NSW generally requires a SafeWork NSW high risk work licence in the relevant class, with periodic inspection duties attached. Licences and inspection records are also the documentation an insurer will ask for first after an incident.
Locally
In Newcastle and the Hunter
Newcastle's CBD and Honeysuckle work puts scaffold over public footpaths regularly, which brings council approval, hoarding requirements and a direct public exposure. Coastal wind is the other local factor: onshore gusts from the harbour and the beaches load sheeted scaffold hard, and sheeting left on in a wind warning is the detail an insurer will examine after a failure.
Questions
Scaffolders — your questions
Not covered here? Ask us directly.
- How much public liability do scaffolders need?
- $20 million is the practical standard, and many principals, councils and commercial contracts require it. The reason is the severity profile rather than the frequency: scaffolding has relatively few claims, but a collapse or a falling component causing serious injury produces a claim that a $5m or $10m limit may not cover.
- Is my scaffold insured while it is erected on a client's site?
- Only if the policy includes scaffold on hire or away from your premises. A standard tools and plant section often limits cover to equipment at your yard or in your vehicle, which is the opposite of where scaffold actually sits. We set the limit against the value of stock out on hire at your busiest, not the value in the yard.
- Am I liable if another trade modifies my scaffold and it fails?
- You will almost certainly be named in the claim, and your policy is what funds the defence. Whether you are ultimately liable turns on your records: the handover certificate, the scafftag, the inspection log and any written warning about unauthorised alteration. Those documents are worth as much as the policy limit in practice.
Other trades
Cover written for the trade next to you
Roofers
Height limits, open-roof water damage and hot works conditions — the three things that decide a roofing claim.
Builders
Contract works, liability for your subcontractors, and the home building compensation question answered properly.
Painters
Overspray, lead paint in older Newcastle housing, and cover for work in occupied homes and premises.
All trades
Every trade we write cover for across Newcastle, Lake Macquarie and the Hunter.
The policy behaviour described on this page is general information about how trades policies commonly work, not personal advice, and wordings differ between insurers. Always read the relevant Product Disclosure Statement. Arena Insurance Brokers is an Authorised Representative of Community Broker Network Pty Ltd, AFSL 233750.
Speak to a broker
Get scaffolder cover priced properly
Tell us what you take on and we will come back with options, the clauses that matter for scaffolders explained in plain terms, and certificates issued to the wording your sites require.
- Telephone
- 02 4067 5203
- Hours
- 8:30am – 5:00pm
- Response
- Same business day